Home/Services/Deck

Deck Building and Repair Quotes

A deck is one of the few home improvements that adds usable living space and visible value at the same time. The price range is wide, though, and most of the spread comes from decisions about material, size and structure that are worth understanding before you compare bids.

Get free deck quotes

Free, no obligation, from verified licensed and insured local contractors.

What deck quotes cover

  • New deck design and construction, attached or freestanding
  • Deck replacement, including tear-out and disposal of the existing structure
  • Resurfacing: new decking boards over a sound existing frame
  • Structural repair to joists, ledgers, posts and footings
  • Railings, stairs, built-in seating, pergolas and privacy screens
  • Staining, sealing and refinishing

What affects the cost

Square footage
The starting point for any estimate, though cost per square foot falls slightly as decks get larger.
Material
Pressure-treated pine is the budget option, cedar and redwood sit above it, and composite and PVC cost the most up front while eliminating most ongoing maintenance.
Height above grade
A deck more than a couple of feet up needs guardrails, stairs and more substantial footings, and typically triggers a permit.
Structural condition
On a replacement, whether the existing frame and footings can be reused is often the difference between two very different numbers.
Railings and stairs
Railing is priced per linear foot and can be a surprising share of the total. Cable and glass systems cost several times more than wood.
Site access
If materials have to be carried through the house or around a tight side yard, labor rises accordingly.

What to expect from your quotes

A good deck quote specifies decking material by brand and grade, joist spacing, footing type and depth, railing system, and whether permits and inspection are included. Ledger attachment detail is worth asking about specifically, since it is the connection most often implicated in deck failures.

Frequently asked questions

Do I need a permit to build a deck?

Frequently yes, and the triggers are usually size and height. Many jurisdictions require a permit once a deck passes roughly 200 square feet, and many exempt uncovered decks whose surface sits below about 30 inches above grade provided they do not affect egress. Anything attached to the house, roofed, or carrying a hot tub is much more likely to require one regardless of size. Because these thresholds vary between neighboring municipalities, confirm with your local building department rather than relying on a general rule. There is a real reason to want the permit beyond compliance: the inspection checks the ledger connection and footing depth, which are exactly the details that cause deck collapses when they are done badly. Unpermitted structural work also tends to surface awkwardly during a home sale.

Is composite decking worth the extra cost?

It depends on how long you plan to keep the house and how you feel about maintenance. Composite and PVC cost meaningfully more up front, often close to double a pressure-treated build, but they do not need sanding, staining or sealing, and they resist splintering and rot. Wood needs cleaning and refinishing every few years, and that cost compounds quietly over a decade. If you are staying long term and dislike weekend maintenance, composite frequently wins on total cost of ownership. If you are selling within a few years, or you want the specific look and feel of real cedar, the premium is harder to justify. A useful middle path is composite for the deck surface where wear and moisture concentrate, with wood used for the framing underneath, which is standard practice anyway.

Can I build a new deck on my old frame?

Sometimes, and it is worth having assessed properly rather than assumed either way. Resurfacing over a sound frame is considerably cheaper than a full rebuild, and if the joists, ledger, posts and footings are in good condition it is a sensible option. What rules it out is structural deterioration, and the parts that fail are frequently the parts you cannot see: the ledger where the deck attaches to the house, the joist ends, and the footings. Older decks also sometimes fail to meet current code on joist spacing or ledger attachment, in which case a permit for the resurfacing work can require the frame to be brought up to standard. Ask any contractor quoting a resurface to explain what they inspected and what they found before you accept the lower number.

Read more before you hire

  • Will Your HOA Approve It? Fences, Decks and Exteriors
  • Do You Need a Permit? And Who Is Supposed to Pull It
  • Why Are Contractor Quotes So Different for the Same Job?

Ready to get deck quotes?

Describe your project once and compare competitive bids from verified local contractors. Free, with no obligation to hire.

Start your deck request